Project Title | Work Description | Country | Execution year | Project status |
COB Phase I Project | Crude Oil Boilers Swapping from Crude Oil to Fuel Gas – Phase1 | Saudi Arabia | 2023 | Ongoing |
Revamping services | 144 PQE & Full revamping service (Furnace#1 & 8) | Saudi Arabia | 2021 | Completed |
Elevated Flare Lines | Installation of 5 Flow Meters on All Elevated Flare Lines of U&O Plant Approved PR#3000012237 | Saudi Arabia | 2021 | Completed |
BPA LP Flare | Flow Meter on Vent Headers to BPA LP Flare | Saudi Arabia | 2023 | Completed |
Modification of Seal Water System of Centrifuges | Complete Civil, Mechanical and Electrical & Instrumentation works | Saudi Arabia | 2023 | Completed |
Line Replacement works | Change Specification of Jacketed Piping for Suction Line from TK-52550 to P-52550 A and B | Saudi Arabia | 2023 | Completed |
Project Title | Work Description | Country | Execution year | Project status |
Plant IV – mv Power cable Replacement works | Install MV cables along with the overhead cable trays | Saudi Arabia | 2023 | Ongoing |
Cable tray installation works | Installation of overhead cable tray system | Saudi Arabia | 2020 | Completed |
Reformer Maintenance works | Plant-III Reformer Maintenance TAM 2020 F-3201 Mechanical Activities | Saudi Arabia | 2020 | Completed |
Catalyst Tube Replacement works | F-1201 catalyst tubes & outlet pigtails replacement in Plant-2 | Saudi Arabia | 2020 | Completed |
AR RAZI Water Quality Project | Complete scope of project activities with the Instrumentation, Electrical, Piping, Civil and Structural disciplines | Saudi Arabia | 2023 | Ongoing |
Project Title | Work Description | Country | Execution year | Project status |
Plant IV – mv Power cable Replacement works | Install MV cables along with the overhead cable trays | Saudi Arabia | 2023 | Ongoing |
Upgrade RM1 Compactor Replacement | Complete Civil, Mechanical and Electrical & Instrumentation works | Saudi Arabia | 2023 | Completed |
Separation Quench system from BM II open circuit | Procurement, construction, inspection, testing, pre-commissioning, and commissioning for Mechanical works | Saudi Arabia | 2023 | Completed |
13 no’s PGH Tube replacement | PGH Radiant coil Replacement activity for MOD D2023 Turnaround | Saudi Arabia | 2023 | Ongoing |
Project Title | Work Description | Country | Execution year | Project status |
Ethylene plant Furnace re-tubing works | Furnace Retubing works | Saudi Arabia | 2023 | Ongoing |
Project Title | Work Description | Country | Execution year | Project status |
Steam tracing and Electrical heat tracing works | Replacement of Steam tracing with Electrical Heat tracing for 1AT-2401A/B & 2AT-2401A/B | Saudi Arabia | 2023 | Ongoing |
EG3 flare stack | Install ultrasonic flowmeter in EG3 flare stack | Saudi Arabia | 2022 | Completed |
Client | Project Title | Work Description | Country | Execution year | Project status |
GAS Jubail | Nitrogen pipeline to Advance petrochemical | Complete Civil, Mechanical and Electrical & Instrumentation works | Saudi Arabia | 2023 | Ongoing |
GOX Jump Over Line project | GOX Jump Over Line from Phase-7 to Phase-2 | Saudi Arabia | 2023 | Ongoing |
Passive Defense fence Project | Passive Defense fence Project for (Phase 1& 2, Phase 4 & 5,81-T-111) | Saudi Arabia | 2021 | Completed |
Improvement of Instrument Air | Improvement of Instrument Air and Seal Gas network | Saudi Arabia | 2021 | Completed |
Improvement of Instrument Air | Improvement of Instrument Air and Seal Gas network | Saudi Arabia | 2021 | Completed |
Project Title | Work Description | Country | Execution year | Project status |
Installation of Spare 220-HE-201 in parallel to existing at MTBE Plant | Separate bigger nozzles, the spare heat exchanger is considered in parallel with the existing 220-HE-201 | Saudi Arabia | 2023 | Ongoing |
Project Title | Work Description | Country | Execution year | Project status |
IBN SINA Tank Overfill Project | Complete Civil, Mechanical and Electrical & Instrumentation works | Saudi Arabia | 2023 | Ongoing |
PCQ-2 Styrene System Enhancement | Supply, Fabrication, painting, and field installation | Saudi Arabia | 2023 | Completed |
MTBE & Methanol piping works | Complete Mechanical works and associated Civil & Electrical works | Saudi Arabia | 2020 | Completed |
DEG Instrumentation work | Electrical & Instrumentation and associated works | Saudi Arabia | 2020 | Completed |
Chemtank Project | DSU Interface instrumentation works | Saudi Arabia | 2020 | Completed |
Piping Replacement works | PK Butadiene Piping circuit replacement | Saudi Arabia | 2019 | Completed |
Project Title | Work Description | Country | Execution year | Project status |
Modification works | Modification of 36” & 8” MOVs | Saudi Arabia | 2020 | Completed |
Project Title | Work Description | Country | Execution year | Project status |
TA IBN Rushd Plant | Aromatic Static Maintenance | Saudi Arabia | 2019 | Completed |